Design Update

Survey data collection along the southern end of the greenway took place in early September. Preliminary design including floodplain analysis and structural layout is forthcoming.

Share Design Update on Facebook Share Design Update on Twitter Share Design Update on Linkedin Email Design Update link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>