Conceptual Design Update

An Encroachment Application has been submitted to Xcel and is currently under review. This step is necessary to determine whether playground equipment can be located within the overhead power easement and to confirm the maximum allowable height for the equipment.

The review process is expected to take approximately four weeks. Once complete, the conceptual design can be finalized, and a public input meeting will be scheduled to review the concept.