TrailMark Park Playground Improvements

Share TrailMark Park Playground Improvements on Facebook Share TrailMark Park Playground Improvements on Twitter Share TrailMark Park Playground Improvements on Linkedin Email TrailMark Park Playground Improvements link
Photo of the current playground at TrailMark Park

Designs for a new playground at TrailMark Park are complete! Proposed improvements include upgraded playground equipment and rubberized safety surfacing to increase accessibility around the playground. A new shade pavilion will replace the existing structure which is at the end of its useful life. New park benches, as well as standard, and ADA accessible picnic tables will provide comfortable places for people to rest while visiting the playground.


Please Note: This project is not related to the TrailMark Community Amenities project. Visit the TrailMark Community Amenities page to learn more.

Designs for a new playground at TrailMark Park are complete! Proposed improvements include upgraded playground equipment and rubberized safety surfacing to increase accessibility around the playground. A new shade pavilion will replace the existing structure which is at the end of its useful life. New park benches, as well as standard, and ADA accessible picnic tables will provide comfortable places for people to rest while visiting the playground.


Please Note: This project is not related to the TrailMark Community Amenities project. Visit the TrailMark Community Amenities page to learn more.

  • Construction / Park Opening Update

    Share Construction / Park Opening Update on Facebook Share Construction / Park Opening Update on Twitter Share Construction / Park Opening Update on Linkedin Email Construction / Park Opening Update link

    The majority of the park renovation project is now complete. Next week, the focus will shift to installing the asphalt parking surface and striping. Simultaneously, the contractor will begin addressing the remaining punch list items. We anticipate the parking area and the rest of the park to be open and fully operational by the end of the day on Friday, September 20.

  • New Tables

    Share New Tables on Facebook Share New Tables on Twitter Share New Tables on Linkedin Email New Tables link

    Two new standard tables and two accessible tables have been built and will be surface-mounted under the shelter once the concrete flatwork has been poured.

  • New Benches

    Share New Benches on Facebook Share New Benches on Twitter Share New Benches on Linkedin Email New Benches link

    Four new benches have been installed around the playground, with companion seating provided at two of the locations


  • Shelter Installation

    Share Shelter Installation on Facebook Share Shelter Installation on Twitter Share Shelter Installation on Linkedin Email Shelter Installation link

    The new 20' x 20' shelter has been installed and the concrete flatwork is scheduled to be poured early next week.

  • Playground Poured In Place Installation - Complete

    Share Playground Poured In Place Installation - Complete on Facebook Share Playground Poured In Place Installation - Complete on Twitter Share Playground Poured In Place Installation - Complete on Linkedin Email Playground Poured In Place Installation - Complete link

    The playground rubber safety surfacing and engineered wood fiber chips have been installed.


  • Playground Surfacing Subgrade Prep

    Share Playground Surfacing Subgrade Prep on Facebook Share Playground Surfacing Subgrade Prep on Twitter Share Playground Surfacing Subgrade Prep on Linkedin Email Playground Surfacing Subgrade Prep link

    The playground surfacing subgrade is being prepped for concrete and rubber safety surfacing.


  • Drinking Fountain Install

    Share Drinking Fountain Install on Facebook Share Drinking Fountain Install on Twitter Share Drinking Fountain Install on Linkedin Email Drinking Fountain Install link

    The new accessible drinking fountain with a dog bowl & bottle filler has been installed!

  • Playground Equipment Install

    Share Playground Equipment Install on Facebook Share Playground Equipment Install on Twitter Share Playground Equipment Install on Linkedin Email Playground Equipment Install link

    Playground equipment was delivered to the site last week. Once all playground equipment is installed, the contractor will begin preparing the subgrade for concrete and rubber safety surfacing.

  • Playground Equipment & Shelter Delay

    Share Playground Equipment & Shelter Delay on Facebook Share Playground Equipment & Shelter Delay on Twitter Share Playground Equipment & Shelter Delay on Linkedin Email Playground Equipment & Shelter Delay link

    Due to manufacturing delays, the delivery dates for the playground equipment and shelter have been postponed. We now anticipate the arrival of these materials during the week of August 5th, with installation to occur immediately upon delivery. In the meantime, minimal work will be conducted as the remaining tasks are contingent upon the installation of the playground. Items remaining until the project is complete:

    - Installation of the playground equipment

    - Installation of the 4" concrete subbase

    - Installation of the rubber safety surfacing

    - Installation of the engineered wood fiber

    - Installation of the new 20' x 20' shelter

    - Installation of shelter electrical (this item will be delayed due to an unanticipated Xcel transformer needing to be installed in the park, but will not impact opening the park)

    - Installation of site furnishings (ADA tables, tables, benches)

    - Regrading and installing new asphalt in the parking lot

    - Installing new parking lot striping

    It is anticipated that construction will be complete mid-late September.

  • 2 Rail Fence - Cedar Post Install

    Share 2 Rail Fence - Cedar Post Install on Facebook Share 2 Rail Fence - Cedar Post Install on Twitter Share 2 Rail Fence - Cedar Post Install on Linkedin Email 2 Rail Fence - Cedar Post Install link

    Majority of the post have been set for the 2 rail cedar fence paralleling S Field Way. Please continue to use caution while utilizing the trail in this area. The fence work is anticipated to be complete the week of July 22.

Page last updated: 13 Sep 2024, 01:40 PM