Abbott Park Improvements Project
Project is Complete
South Suburban is excited to announce that we will be improving the playground area with new modern-themed playground equipment and rubberized safety surfacing! Additional improvements will include a post-tension basketball court with new goals, new benches, upgraded ADA parking spaces, and new concrete walks. The existing shade pavilion, san-o-let enclosure, security light, tables, and drinking fountain will remain, as they were part of an improvement project in 2015. This project is anticipated to be complete in December 2023. Come check it out when the project is complete!
South Suburban is excited to announce that we will be improving the playground area with new modern-themed playground equipment and rubberized safety surfacing! Additional improvements will include a post-tension basketball court with new goals, new benches, upgraded ADA parking spaces, and new concrete walks. The existing shade pavilion, san-o-let enclosure, security light, tables, and drinking fountain will remain, as they were part of an improvement project in 2015. This project is anticipated to be complete in December 2023. Come check it out when the project is complete!
Project is Complete
-
Concrete Flatwork - Bench Pads
Share Concrete Flatwork - Bench Pads on Facebook Share Concrete Flatwork - Bench Pads on Twitter Share Concrete Flatwork - Bench Pads on Linkedin Email Concrete Flatwork - Bench Pads link(3) Bench pads have been added
to the western perimeter of the playground. Benches are to be surface mounted by the end of the week.
-
Concrete Flatwork - Shelter Pad and Accessible Walks
Share Concrete Flatwork - Shelter Pad and Accessible Walks on Facebook Share Concrete Flatwork - Shelter Pad and Accessible Walks on Twitter Share Concrete Flatwork - Shelter Pad and Accessible Walks on Linkedin Email Concrete Flatwork - Shelter Pad and Accessible Walks linkThe shelter pad and remaining accessible walk to the S High St. parking lot were formed yesterday. They are being poured today, November 21.
-
Poured in Place - Top Layer
Share Poured in Place - Top Layer on Facebook Share Poured in Place - Top Layer on Twitter Share Poured in Place - Top Layer on Linkedin Email Poured in Place - Top Layer linkThe poured in place rubber safety surfacing top layer was installed today.
-
Post Tension Basketball Court - Concrete Pour
Share Post Tension Basketball Court - Concrete Pour on Facebook Share Post Tension Basketball Court - Concrete Pour on Twitter Share Post Tension Basketball Court - Concrete Pour on Linkedin Email Post Tension Basketball Court - Concrete Pour linkThe post tension basketball court has been poured and the contractor has begun the tensioning process.
-
Poured in Place Rubber Safety Surfacing - Base Layer Install
Share Poured in Place Rubber Safety Surfacing - Base Layer Install on Facebook Share Poured in Place Rubber Safety Surfacing - Base Layer Install on Twitter Share Poured in Place Rubber Safety Surfacing - Base Layer Install on Linkedin Email Poured in Place Rubber Safety Surfacing - Base Layer Install linkThe 2" thick base layer has been installed for the poured in place rubber safety surfacing. The top layer, or colorful layer will be installed next week with warmer temperatures.
-
Concrete Flatwork - 4" Concrete Subbase
Share Concrete Flatwork - 4" Concrete Subbase on Facebook Share Concrete Flatwork - 4" Concrete Subbase on Twitter Share Concrete Flatwork - 4" Concrete Subbase on Linkedin Email Concrete Flatwork - 4" Concrete Subbase linkCrews are wrapping up the 4" concrete sub-base pour within the playground footprint. They are on schedule to pour the post tension basketball court tomorrow.
-
Post Tension Basketball Court - Tendon Install
Share Post Tension Basketball Court - Tendon Install on Facebook Share Post Tension Basketball Court - Tendon Install on Twitter Share Post Tension Basketball Court - Tendon Install on Linkedin Email Post Tension Basketball Court - Tendon Install linkThe post tension tendons were installed. It is anticipated the basketball court will be poured early next week.
-
Concrete Flatwork - Playground Sidewalk
Share Concrete Flatwork - Playground Sidewalk on Facebook Share Concrete Flatwork - Playground Sidewalk on Twitter Share Concrete Flatwork - Playground Sidewalk on Linkedin Email Concrete Flatwork - Playground Sidewalk linkThe concrete sidewalk connecting E Otero Street to the internal park trail was completed today. It is anticipated the remaining flatwork will be formed and poured next week.
-
Concrete Flatwork - South Lot
Share Concrete Flatwork - South Lot on Facebook Share Concrete Flatwork - South Lot on Twitter Share Concrete Flatwork - South Lot on Linkedin Email Concrete Flatwork - South Lot linkThe southern portion of the concrete flatwork was poured today. The remaining flatwork for the sidewalks will be installed tomorrow utilizing a pump truck from the west lot.
-
Post Tension Basketball Court - Formed
Share Post Tension Basketball Court - Formed on Facebook Share Post Tension Basketball Court - Formed on Twitter Share Post Tension Basketball Court - Formed on Linkedin Email Post Tension Basketball Court - Formed linkThe post tension basketball court has been formed. The tendons will be installed early next week with concrete scheduled to be poured at the end of the week.
Last Updated
18 June 2024
Who's Listening
-
Park Planner II
Email WBarringer@ssprd.org
Timeline
-
Online Survey
Abbott Park Improvements Project has finished this stageSept. 16 - Oct. 7, 2022
-
Open House
Abbott Park Improvements Project has finished this stageOct. 6, 2022 from 5:30-7 pm at Abbott Park
-
Design
Abbott Park Improvements Project has finished this stageJanuary - December 2022
-
Award of Contract
Abbott Park Improvements Project has finished this stageFeb. 8, 2023
-
Construction
Abbott Park Improvements Project has finished this stageJune - December 2023
-
Park Dedication
Abbott Park Improvements Project is currently at this stageJune 27, 2024 from 4-6pm