Fairways at Lone Tree Park Improvements

Share Fairways at Lone Tree Park Improvements on Facebook Share Fairways at Lone Tree Park Improvements on Twitter Share Fairways at Lone Tree Park Improvements on Linkedin Email Fairways at Lone Tree Park Improvements link
Photo of Fairways at Lone Tree Park

Planning and design for the renovation of the Fairways at Lone Tree Park are underway. In response to public input, the small shade pavilion near the existing parking area will be replaced by a post-tension basketball half-court. Modern playground equipment and rubberized safety surfacing will increase accessibility to and around play equipment. Additional landscape features will protect vegetation and minimize erosion. A new shade pavilion, picnic tables, and benches will replace amenities at the end of their useful life to ensure comfort for park visitors. To optimize motor vehicle access to the park, the parking lot entryway will be realigned, parking spaces will be reconfigured, and the parking lot will be resurfaced.

Planning and design for the renovation of the Fairways at Lone Tree Park are underway. In response to public input, the small shade pavilion near the existing parking area will be replaced by a post-tension basketball half-court. Modern playground equipment and rubberized safety surfacing will increase accessibility to and around play equipment. Additional landscape features will protect vegetation and minimize erosion. A new shade pavilion, picnic tables, and benches will replace amenities at the end of their useful life to ensure comfort for park visitors. To optimize motor vehicle access to the park, the parking lot entryway will be realigned, parking spaces will be reconfigured, and the parking lot will be resurfaced.

  • Playground Designs Available to View

    Share Playground Designs Available to View on Facebook Share Playground Designs Available to View on Twitter Share Playground Designs Available to View on Linkedin Email Playground Designs Available to View link

    Based on responses to an online survey from Oct. 17-31, 2022, the playground equipment pictured below is planned.


Page last updated: 28 May 2025, 03:14 PM