Fairways at Lone Tree Park Improvements
This project has concluded.
Planning and design for the renovation of the Fairways at Lone Tree Park are underway. In response to public input, the small shade pavilion near the existing parking area will be replaced by a post-tension basketball half-court. Modern playground equipment and rubberized safety surfacing will increase accessibility to and around play equipment. Additional landscape features will protect vegetation and minimize erosion. A new shade pavilion, picnic tables, and benches will replace amenities at the end of their useful life to ensure comfort for park visitors. To optimize motor vehicle access to the park, the parking lot entryway will be realigned, parking spaces will be reconfigured, and the parking lot will be resurfaced.
Planning and design for the renovation of the Fairways at Lone Tree Park are underway. In response to public input, the small shade pavilion near the existing parking area will be replaced by a post-tension basketball half-court. Modern playground equipment and rubberized safety surfacing will increase accessibility to and around play equipment. Additional landscape features will protect vegetation and minimize erosion. A new shade pavilion, picnic tables, and benches will replace amenities at the end of their useful life to ensure comfort for park visitors. To optimize motor vehicle access to the park, the parking lot entryway will be realigned, parking spaces will be reconfigured, and the parking lot will be resurfaced.
This project has concluded.
-
Park Dedication - Postponed
Share Park Dedication - Postponed on Facebook Share Park Dedication - Postponed on Twitter Share Park Dedication - Postponed on Linkedin Email Park Dedication - Postponed linkThe park celebration originally scheduled for June 26 has been rescheduled for July 10 from 4-6pm. Apologies for any confusion this postponement may have created. We look forward to seeing you at the park!
The park celebration originally scheduled for June 26 has been rescheduled for July 10 from 4-6pm. Apologies for any confusion this postponement may have created. We look forward to seeing you at the park!
This project has concluded.
-
Park Dedication
Share Park Dedication on Facebook Share Park Dedication on Twitter Share Park Dedication on Linkedin Email Park Dedication link

This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkThe contractor is completing final park improvements this month. Improvements include relocating the drinking fountain to ensure ADA accessibility, installing a bike rack, replacing the gravel path with stone pavers, and placing riprap around the playground drain outfall to minimize erosion. Keep an eye out for notifications regarding a dedication event in the park this summer.
The contractor is completing final park improvements this month. Improvements include relocating the drinking fountain to ensure ADA accessibility, installing a bike rack, replacing the gravel path with stone pavers, and placing riprap around the playground drain outfall to minimize erosion. Keep an eye out for notifications regarding a dedication event in the park this summer.
This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkInstallation of the shade structure, san-o-let enclosure, and picnic tables is complete. The contractor will make final landscaping improvements and relocate the drinking fountain to ensure ADA accessibility once water is turned on at the park this spring.

Installation of the shade structure, san-o-let enclosure, and picnic tables is complete. The contractor will make final landscaping improvements and relocate the drinking fountain to ensure ADA accessibility once water is turned on at the park this spring.

This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkDelivery of the san-o-let enclosure and shade pavilion are scheduled for the second half of February. The contractor is preparing to install remaining site furnishings and make minor landscaping modifications once the structures are in place.
Delivery of the san-o-let enclosure and shade pavilion are scheduled for the second half of February. The contractor is preparing to install remaining site furnishings and make minor landscaping modifications once the structures are in place.
This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkFairways at Lone Tree Park playground has re-opened. The contractor will install remaining site furnishings upon arrival, and a park dedication event will take place in the spring. Thank you for your patience while portions of the park were closed during construction.

Fairways at Lone Tree Park playground has re-opened. The contractor will install remaining site furnishings upon arrival, and a park dedication event will take place in the spring. Thank you for your patience while portions of the park were closed during construction.

This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkPlayground installation is nearly complete. The contractor will pave the parking lot and install shelter caissons when weather permits. The shelter, san-o-let enclosure, and final site furnishings will be installed upon arrival in the spring.
Playground installation is nearly complete. The contractor will pave the parking lot and install shelter caissons when weather permits. The shelter, san-o-let enclosure, and final site furnishings will be installed upon arrival in the spring.
This project has concluded.
-
Construction Update
Share Construction Update on Facebook Share Construction Update on Twitter Share Construction Update on Linkedin Email Construction Update linkConstruction is progressing as planned. The contractor installed boulder walls, landscaping, post tension court, and much of the ADA accessible walkway. Playground equipment delivery and installation is scheduled for November.


Construction is progressing as planned. The contractor installed boulder walls, landscaping, post tension court, and much of the ADA accessible walkway. Playground equipment delivery and installation is scheduled for November.


This project has concluded.
-
Park Construction
Share Park Construction on Facebook Share Park Construction on Twitter Share Park Construction on Linkedin Email Park Construction linkConstruction in the park will begin September 10, 2024 and is anticipated to be complete at the end April, 2025. The fields will remain open, but the playgrounds, shade pavilions, and parking lots will be inaccessible during this time. Please use caution during park construction and check back here for the most up to date project information.
Construction in the park will begin September 10, 2024 and is anticipated to be complete at the end April, 2025. The fields will remain open, but the playgrounds, shade pavilions, and parking lots will be inaccessible during this time. Please use caution during park construction and check back here for the most up to date project information.
This project has concluded.
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe Site Improvement Plan was approved by the City of Lone Tree and South Suburban received final construction drawings on May 21, 2024. The project has gone out to bid and a construction contract will be proposed during the July 10 meeting with the Board of Directors.
The Site Improvement Plan was approved by the City of Lone Tree and South Suburban received final construction drawings on May 21, 2024. The project has gone out to bid and a construction contract will be proposed during the July 10 meeting with the Board of Directors.
This project has concluded.
Last Updated
24 June 2025
Who's Listening
-
Park Planner II
Timeline
-
Open House
Fairways at Lone Tree Park Improvements has finished this stageResidents were invited to an open house event to view the proposed site plan on Oct. 5, 2022.
-
Public Input Survey
Fairways at Lone Tree Park Improvements has finished this stageResidents were invited to respond to a public input survey from Oct. 17-31, 2022.
-
Preliminary Design
Fairways at Lone Tree Park Improvements has finished this stageJanuary-June 2023
-
Design Development
Fairways at Lone Tree Park Improvements has finished this stageOctober 2023-May 2024.
-
Pre-construction Coordination
Fairways at Lone Tree Park Improvements has finished this stageStaff are soliciting construction proposals and ordering playground equipment
June-September 2024.
-
Construction
Fairways at Lone Tree Park Improvements is currently at this stageSeptember 2024 - April 2025
-
Park Dedication
this is an upcoming stage for Fairways at Lone Tree Park ImprovementsSpring 2025