Kline Homestead Park Improvement Project
Exciting plans are underway for Kline Homestead Park! Proposed improvements include new playground equipment with poured in place rubber safety surfacing to increase ADA accessibility throughout the playground area and a post-tension basketball court for enhanced durability. A larger, lighted shade pavilion and san-o-let enclosure will improve comfort and safety for park visitors. Updated site furnishings including picnic tables, benches, and a bike rack will replace amenities at the end of their useful life. New concrete flatwork will ensure ADA accessibility around proposed amenities and the parking lot will be resurfaced.
Use the "Subscribe" tool in the right column on this page to sign up to receive project updates.
Exciting plans are underway for Kline Homestead Park! Proposed improvements include new playground equipment with poured in place rubber safety surfacing to increase ADA accessibility throughout the playground area and a post-tension basketball court for enhanced durability. A larger, lighted shade pavilion and san-o-let enclosure will improve comfort and safety for park visitors. Updated site furnishings including picnic tables, benches, and a bike rack will replace amenities at the end of their useful life. New concrete flatwork will ensure ADA accessibility around proposed amenities and the parking lot will be resurfaced.
Use the "Subscribe" tool in the right column on this page to sign up to receive project updates.
-
Playground Equipment Selection Survey
Share Playground Equipment Selection Survey on Facebook Share Playground Equipment Selection Survey on Twitter Share Playground Equipment Selection Survey on Linkedin Email Playground Equipment Selection Survey linkFinal playground equipment options for Kline Homestead Park are in! If you would like to vote on your preferred playground for the upcoming park renovations, please select the “survey” tab above and submit your response. The survey is available November 26 - December 9, 2025. Thank you for your interest in the Kline Homestead Park Improvement Project!
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe design consultant is updating 60% construction drawings based on feedback from staff. Staff provided comments for the playground equipment vendor to update designs and proposals. An online survey is planned for the end of November through early December to gather public input on preferred playground equipment.
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe design consultant completed 60% construction drawings and will submit plans to Douglas County upon completion of necessary revisions based on staff feedback. Douglas County's review will ensure all appropriate documents are prepared prior to construction and streamline the application process when the contractor applies for required permits. Public input on preferred playground equipment is postponed until the playground vendor updates equipment options based on staff feedback from the most recent plans. Staff will issue an online survey for preferred playground equipment in November.
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe Board of Directors approved the Final Site Plan at the Sept. 10 meeting. The design consultant is continuing design development and coordinating with the Civil Engineer for the initial phase of construction drawings. Staff are reviewing proposals from playground vendors, and an online survey will be available in late October for residents to select their preferred playground equipment.
-
Preliminary Site Plan
Share Preliminary Site Plan on Facebook Share Preliminary Site Plan on Twitter Share Preliminary Site Plan on Linkedin Email Preliminary Site Plan link -
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkAfter incorporating feedback from the community, the design consultant has begun developing 30% construction drawings and a Proposed Final Site Plan for Board of Directors consideration in September.
-
Public Input Survey - Responses
Share Public Input Survey - Responses on Facebook Share Public Input Survey - Responses on Twitter Share Public Input Survey - Responses on Linkedin Email Public Input Survey - Responses linkThank you to those who attended the public input meeting and participated in the online survey! Playground style preferences as indicated during the in-person public input meeting are shown below. Staff are reviewing survey responses and considering feedback during the ongoing design development process.

-
Public Input Survey
Share Public Input Survey on Facebook Share Public Input Survey on Twitter Share Public Input Survey on Linkedin Email Public Input Survey linkPlease select the "Survey" button at the top of the news feed to participate in a survey regarding proposed park improvements now through July 7.
Thank you for your interest in the Kline Homestead Park Improvement Project!
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe pre-submittal meeting with Douglas County was postponed to June 5. A public outreach event will take place at the shade structure in the park on June 24 from 4-6 pm. Keep a lookout for notifications about an online survey regarding future park improvements later this month..
-
Planning Update
Share Planning Update on Facebook Share Planning Update on Twitter Share Planning Update on Linkedin Email Planning Update linkThe design consultant developed conceptual plans for the playground renovation at Kline Homestead Park. A pre-submittal meeting with Douglas County is scheduled for May 29. Staff are preparing presentation boards for a public outreach event in the park at the end of June.
Last Updated
26 November, 2025
Who's Listening
-
CIP Project Manager II
Timeline
-
Site Analysis
Kline Homestead Park Improvement Project has finished this stageMarch - May 2025
-
Preliminary Design
Kline Homestead Park Improvement Project has finished this stageJune 2025
-
Public Survey 1
Kline Homestead Park Improvement Project has finished this stageJune 10 - July 7
-
Public Input Meeting
Kline Homestead Park Improvement Project has finished this stageJune 24, 2025
-
Design Development
Kline Homestead Park Improvement Project has finished this stageJuly - October 2025
-
Public Survey 2
Kline Homestead Park Improvement Project is currently at this stageNovember 26 - December 9
-
County Review
this is an upcoming stage for Kline Homestead Park Improvement ProjectJanuary 2026
-
Final Construction Drawings
this is an upcoming stage for Kline Homestead Park Improvement ProjectFebruary 2026
-
Bidding Process
this is an upcoming stage for Kline Homestead Park Improvement ProjectSpring 2026
-
Construction
this is an upcoming stage for Kline Homestead Park Improvement ProjectSpring 2026
-
Park Dedication
this is an upcoming stage for Kline Homestead Park Improvement ProjectSummer 2026